GSLV Mk.3 [ISRO]
GSLV Mk III is envisaged to launch four tonne satellite into geosynchronous transfer orbit. GSLV-Mk III is a three-stage vehicle with a 110 ton core liquid propellant stage (L-110) and a strap-on stage with two solid propellant motors, each with 200 tons propellant (S-200). The upper stage will be cryogenic fueled with a propellant loading of 25 tons (C-25). GSLV Mk-III will have a lift-off weight of about 629 tons and will be 42.4 m tall. The payload fairing will have a diameter of 5 m and a payload volume of 100 cubic meters.
| Version | Strap-On | Stage 1 | Stage 2 |
|---|---|---|---|
| GSLV Mk.3 (1 st.) | 2 S-200 | L-110 / 2 Vikas | Dummy C-25 |
| GSLV Mk.3 | 2 S-200 | L-110 / 2 Vikas | C-25 / CS |
| Performance (kg) | LEO | LPEO | SSO | GTO | GEO | MolO | IP |
|---|---|---|---|---|---|---|---|
| GSLV Mk.3 | 4000 |
No: TypeNo:Serial Type Date LS Payload
none Planned: 1 1 GSLV Mk.3 (1st) xx.xx.2012 * Sr SLP (R&D) 2 1 GSLV Mk.3 xx.xx.xxxx Sr GSat 10 3 2 GSLV Mk.3 xx.xx.xxxx Sr GSat 11